[Construction Example] Manufacturing Factory: Underfloor Void, Hollow, and Loose Filling Work
We will introduce a case where the space under the floor was filled 100% without moving the machinery!
We would like to introduce a case of "filling work for floor voids, cavities, and looseness" carried out at a manufacturing factory in Gunma Prefecture. It was necessary to compact and strengthen the ground around the machinery while filling the voids, so we adopted the Upcon method, which allows work to be done in a narrow space without removing the machinery. We performed resin injection work while constantly checking the level, and after construction, we confirmed the resin filling using a CCD camera. 【Case Overview】 ■ Construction Area: Approximately 140m2 ■ Area: Gunma Prefecture ■ Construction Period: 1 day *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other